The earthquake and damages

Story: NPO Midorikai, Local Activity Support Center (Vocational support center for the disabled), Midori Workshop Wakabayashi
Director: Ms. Mariko Konno

What were you doing at the time of the disaster?

That day was a recreation day at the workshop. Our activities normally go until 14:40, but recreation ended a little early that day, and the earthquake came when we were taking a break around 14:30. We were just resting on the sofa at the time.

Our disabled trainees were just really shocked, but they didn’t panic or anything.

 

How did you deal with the shaking, and what were the damages?

The lights in the room where we were resting were made of glass, so we had the trainees avoid those and take refuge elsewhere. There were some people in front of the dish shelves as well, so we guided those people to a safe place.

We had been doing regular evacuation drills at the workshop long before the disaster happened. We also had things posted on the walls so people could visually see which places in the workshop were safe, and which were dangerous.

We had always maintained that sort of disaster prevention awareness. On that day too, everyone responded based on our previous drills and preparations.

Besides securing safe places and confirming unsafe places in the workshop, we had also secured all the shelves in the facility. Thanks to these preparations, not a single person was injured, not a single thing fell over, and we incurred no damages from the earthquake.

ページの上へ戻る